Jones King

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

New Central Oncology Unit, Cheltenham General Hospital

Engineering Services

  • Heating and cooling
  • Ventilation
  • Air conditioning
  • Refrigeration
  • General water services
  • Public health
  • Fire protection
  • Alarms and detection
  • Thermal modelling
  • Building acoustics
  • Vibration control
  • Electrical distribution
  • Power generation
  • General lighting
  • Energy conservation
  • Pollution control
  • Security and CCTV
  • Vertical transport
  • Sustainable engineering
  • Voice and data


The challenge here was to design and engineer 5,500 m2 gross area of complex acute medical facilities for cancer treatment. We had to incorporate a Neutropeanic suite which required individual close control of both temperature and room pressurisation

Also incorporated was a new operating suite, three linear accelerators, Radioactive Materials laboratories and engineering workshops

We have considerable expertise and a wide experience in the design requirements for major healthcare projects


JONES KING PARTNERSHIP

Quayside
40 - 58 Hotwell Road
Bristol
BS8 4UQ

T 0117 922 1681
office@jonesking.com



BSRIABREEAMaceconstruction onlineLow carbon Consultants

Jones King Partnership | Quayside | 40 - 58 Hotwell Road | Bristol BS8 4UQ | T  0117 922 1681 | office@jonesking.com
Copyright © Jones King Partnership | Web Designers & Internet Marketing Company Net Digital Limited| Terms and Conditions