Logo goes here
   
Home PageLink to About UsLink to ProfileLink to SustainabilityProjects MenuLink to Contact Us
New Ward Block Phase 1 St Lukes Wing, Cheltenham General Hospital Engineering Services

Phase 1 comprised a new 66 bed medical ward unit of 3,400 m2 gross floor area with provision for a Phase 2 extension adjacent to the main general hospital

Facilities include a Coronary Care Unit, General Wards and a private patient ward facility on the top floor

St. Luke's Wing

JONES KING PARTNERSHIP

Quayside
40 - 58 Hotwell Road
Bristol
BS8 4UQ

Bristol: 0117 922 1681 Northampton: 0160 449 8313
office@jonesking.com

AceConstructionline   Low Carbon Consultant
  • Heating and cooling
  • Ventilation
  • Air conditioning
  • Refrigeration
  • General water services
  • Public health
  • Fire protection
  • Alarms and detection
  • Thermal modelling
  • Building acoustics
  • Vibration control
  • Electrical distribution
  • Power generation
  • General lighting
  • Energy conservation
  • Pollution control
  • Security and CCTV
  • Vertical transport
  • Sustainable engineering
  • Voice and data
  •